60-80kW Integrated DC EV Charger


PTN-DC Series | 60kW / 80kW Integrated Dual-Gun DC Fast Charger

Built for public charging stations, commercial parking lots, logistics hubs, and highway service stations requiring high-throughput DC charging


✅ Dual-gun design: 60kW (40kW+20kW) / 80kW (40kW+40kW) configurations for simultaneous charging

✅ 200–1000V wide output range, compatible with most commercial and passenger EV models

✅ High efficiency ≥95% with PF ≥0.99, meeting grid stability and energy-saving requirements

✅ Ethernet/4G communication for seamless backend management and monitoring

✅ IP54-rated design for both indoor and outdoor installation, built for heavy public use


Core Performance

Two scalable power configurations: 60kW (max 150A per gun) and 80kW (max 200A per gun), supporting simultaneous charging of two vehicles

200–1000V DC wide output range, covering nearly all mainstream EV models on the market

Peak efficiency ≥95% with power factor ≥0.99 and THD ≤5%, ensuring high energy utilization and compliance with grid standards

Compact integrated design (700×400×1400mm) with forced air cooling, ideal for high-traffic public charging scenarios



Smart Charging & Operation

Dual-gun charging strategy: flexible power distribution to adapt to different vehicle power demands

Precise output control: ±0.5% voltage accuracy and ±1% current accuracy, ensuring stable and safe charging

Ethernet/4G communication for remote monitoring, data logging, and backend system integration

Designed for easy integration with charging management platforms, supporting billing and user management


Safety & Environmental Adaptability

IP54 dust and water resistance rating, suitable for both indoor and sheltered outdoor installations

Wide working temperature range: -20℃ ~ +50℃, stable performance in most climates

Altitude adaptability: no power derating up to 2000m, with temperature compensation for higher altitudes

Reliable cooling system with forced air cooling, preventing overheating during continuous high-power operation


Installation & Usability

Three-phase 400VAC ±15% input, compatible with standard commercial power grids

Low standby power consumption and high MTBF, ensuring low-maintenance operation in public networks

Dual-gun design maximizes charging throughput, reducing user waiting times in busy locations

Modular structure for easy maintenance and component replacement


Commercial & Customization Support

Ideal for bulk deployment in public charging stations, logistics parks, highway service areas, and commercial facilities

Customization available for power configurations, communication protocols, and payment system integration

Full certification documents provided, meeting market access requirements for public infrastructure

Designed for long-term operation in high-traffic environments, with robust build quality and low operational costs


Quickly Inquiry

Kaixiang